nursingstudyhelp.com logo

Our Services

Get 15% Discount on your First Order

Deliverable 6 – Project Management Best Practices Top of Form Bottom of Form Assignment Content 1. Top of Form Competency

Deliverable 6 – Project Management Best Practices

Top of Form

Bottom of Form

Assignment Content

1.

Top of Form

Competency

Apply project management methodologies and appropriate tools to information technology projects.

Student Success Criteria

View the grading rubric for this deliverable by selecting the “This item is graded with a rubric” link, which is located in the
Details & Information pane.

Scenario

You are a business analyst brought to a prospective customer who operates several different ecommerce websites. The company has grown rapidly until recently. The growth has created a number of complicated processes that have slowed the ability to process end user orders quickly. The result of this slower order processing has resulted in end user complaints.

The project scope was accepted by the company which includes various milestones to create a move to an Agile Development and implementation approach. A number of processes are included both technology bases and operations based functions. The business transformation was significant, but after initial resistance, the organization embraced the change and the project was successfully completed.

The client’s president wrote a letter to the president of your company with a glowing recommendation of your work on the project. Your participation on the project was identified as a key contribution the project success.

During a meeting with your boss and the president, you were asked to identify key factors which enabled your success on the project to help mentor the other consultants.

Instructions

Create a white paper that includes the following:

· A simple cover letter 
(see the resource below about writing a white paper as a guide)

· Use fictitious names for the to and from lines

· Use your name as the author of the white paper

· A Table of Contents 
(see the resource below about writing a white paper as a guide)

· Explanation of the different methodologies

· Use bullets to detail main idea of the different methods

· Identify which project management tools will work best in the project

· Select the project management approach that best meets those requirements

Be sure to check grammar and spelling before submitting.

Resources

To set up a Grammarly account, click 

How do I create a Grammarly account?

For assistance creating a White Paper, please read 

Business Reports for Busy People – Chapter 5 – White Paper Template
.

Bottom of Form

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

  Discussion 4 Urinary Function: Mr. J.R. is a 73-year-old man, who was

  Discussion 4 Urinary Function: Mr. J.R. is a 73-year-old man, who was admitted to the hospital with clinical manifestations of gastroenteritis and possible renal injury. The patient’s chief complaints are fever, nausea with vomiting and diarrhea for 48 hours, weakness, dizziness, and a bothersome metallic taste in the mouth.

01/08/24 MC7P77 Business Consultancy Project | London Metropolitan University MC7P77 Business Consultancy Project (2023-24) View Online Collis,

01/08/24 MC7P77 Business Consultancy Project | London Metropolitan University MC7P77 Business Consultancy Project (2023-24) View Online Collis, J. and Hussey, R. (2021) Business research: a practical guide for students. 5th edition. London: Macmillan Education UK. Available at: Conn, C. and McLean, R. (2019) Bulletproof problem solving. Hoboken, New Jersey: John

Description ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi

Description ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 3 MGT322 (2nd Term 2023-2024) Deadline: 04/05/2024 @ 23:59 Course Name: Logistics Management Course Code: MGT322 Student’s Name: Semester: 2nd CRN: Student’s ID Number: