   DESIGNING A NURSING INFORMATICS PROJECT FOR YOUR ORGANIZATION  PHASES OF PROJECT MANAGEMENT TABLE 3.3 Scope Statement Organization’s

  

DESIGNING A NURSING INFORMATICS PROJECT FOR YOUR ORGANIZATION 

PHASES OF PROJECT MANAGEMENT

TABLE 3.3 Scope Statement

Organization’s name:

Project’s name:

Scope document:

Project manager: Priority level: Low, Medium, High  

Sponsors:    

Mission statement:

Measurable project objectives:

Justification:

Implementation strategy:

Project resources:

Completion date:

Measures of success/critical success factors:

Assumptions:

Constraints:

  Stakeholder/Leadership Approvals  

Manager and sponsor: Signatures: Date:

Project manager approval:    

Owner approval:    

SOURCE: Sipes, C. (2016). Project management for the advanced practice nurse. New York, NY: Springer Publishing Company.

Difference Between a Charter and Scope: Getting Approval

A project charter defines the purpose of the project and includes measurable objectives (see Table 3.1). It also includes a list of the high-level requirements for the project as well as the project description. It should include expected milestones and a budget. It includes the PM’s job description, with definitions of the roles and responsibilities, and clearly defines the authority levels, including reporting structure. Finally, it lists who the authorizing person(s) is and includes requirements for how different aspects of the project will be approved.

In contrast, the scope document includes a description of the project and defines the project deliverables (a product or service). It defines what is in scope and what is not included in the scope of the project. It also defines the user acceptance criteria and includes constraints and assumptions for the project (Table 3.4).

TABLE 3.4 Key Differences Between a Charter and Scope Statement

PROJECT SCOPE PROJECT CHARTER

■Describes project

■Includes the purpose and description of the project

■Specifies project deliverables

■Outlines measurable objectives and expected milestones

■Specifies what is in scope and what is not included

■Defines high-level requirements

■Defines the user acceptance criteria

■Lists approval requirements; sign-off authorizes the project

■Lists constraints

■Defines the project manager’s roles and responsibilities and the reporting structure

■Lists assumptions

■Contains the budget

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

Week 4: Instructions: The Test Plan for each project includes the Pseudocode, Flowchart, Goals and Objectives, Functional Requirements, and Test Matrix

Week 4: Instructions: The Test Plan for each project includes the Pseudocode, Flowchart, Goals and Objectives, Functional Requirements, and Test Matrix including Actual Output column.  Below the table are screenshots verifying the actual output for each case. Week 4 Notes – Mathematical Functions;  Characters and Strings Recalling our Week 3

Identify three possible analogies for teacher planning that emphasize different important aspects of the activity. You might consider a variety of

Identify three possible analogies for teacher planning that emphasize different important aspects of the activity. You might consider a variety of sources for these analogies:                   What living thing is like teacher planning in some respect?                    What natural phenomenon is like teacher planning?                    What artistic activity is like teacher planning?   For

Master of Social Work at Liberty University Proposed Course Schedule Template Name___ _________________________ LUID_____ __________________ Cognate

Master of Social Work at Liberty University Proposed Course Schedule Template Name___ _________________________ LUID_____ __________________ Cognate Master in Social work Individual and family counseling Use a table format Start with the First Semester as D term– Fall 2024 Second Semester Course Sub-Term Hours Course Sub-Term Hours Total Hours Total Hours

Description Deliverable Length: 5-8 pages Key Assignment Throughout this course, you will prepare a Key Assignment in the form of a comprehensive written

Description Deliverable Length: 5-8 pages Key Assignment Throughout this course, you will prepare a Key Assignment in the form of a comprehensive written case study analysis of a national-level policy that is reflected in and drawn from the National Southwest Border Counternarcotics (NSWBCN) Strategy (2011). As dramatized in the movie Act of

Description ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi

Description ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 3 Organizational Behaviour (MGT 301) Due Date: 04/05/2024 @ 23:59 Course Name: Organizational Behaviour Student’s Name: Course Code: MGT301 Student’s ID Number: Semester: 2nd